Bahir Dar University laboratory building
In this project we completed the HVAC system work for the whole laboratory building. This included redesigning, supply, installation and commissioning of the system.
HVAC and ventilationMedical gas and laboratories
- Client
- Bahir Dar University
- Project duration
- 24 months
- Location
- Bahir Dar, Ethiopia
Laboratory cabinets
The cabinets installed in the laboratory have solid epoxy resin chemical resistant worktops, per international laboratory equipment standard requirements. In addition, the cabinets have gas cock outlets and copper pipelines for LPG gas circulation and distribution in the chemical laboratory section.
Scope
- HVAC redesign, supply, installation and commissioning
- Fume hood
- Laboratory cabinets with LPG gas distribution
- Galvanized ductwork to SMACNA standards
- VRF system with fan coil units
- Close control unit for the data center
- Toilet extraction with twin fans and disc valves